['Waste']
['TSD Facilities', 'Waste Permitting', 'Hazardous Waste', 'Solid Waste']
11/09/2023
...
(a) During the interim status period the facility shall not:
(1) Treat, store, or dispose of hazardous waste not specified in Part A of the permit application;
(2) Employ processes not specified in Part A of the permit application; or
(3) Exceed the design capacities specified in Part A of the permit application.
(b) Interim status standards. During interim status, owners or operators shall comply with the interim status standards at 40 CFR Part 265.
READ MORESHOW LESS
['Waste']
['TSD Facilities', 'Waste Permitting', 'Hazardous Waste', 'Solid Waste']
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2024 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.