['CERCLA, SARA, EPCRA', 'Waste']
['Solid Waste', 'Contingency Planning', 'TSD Facilities', 'Hazardous Waste']
11/08/2023
...
The contingency plan must be reviewed, and immediately amended, if necessary, whenever:
(a) The facility permit is revised;
(b) The plan fails in an emergency;
(c) The facility changes-in its design, construction, operation, maintenance, or other circumstances-in a way that materially increases the potential for fires, explosions, or releases of hazardous waste or hazardous waste constituents, or changes the response necessary in an emergency;
(d) The list of emergency coordinators changes; or
(e) The list of emergency equipment changes.
READ MORESHOW LESS
['CERCLA, SARA, EPCRA', 'Waste']
['Solid Waste', 'Contingency Planning', 'TSD Facilities', 'Hazardous Waste']
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2024 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.