['Water Programs']
['Stormwater', 'Water Permitting', 'Point Sources', 'Water Quality', 'Municipal Wastewater', 'Industrial Wastewater']
05/09/2022
...
Each section 301(h) modified permit issued shall contain, in addition to all applicable terms and conditions required by 40 CFR part 122, the following:
(a) Effluent limitations and mass loadings which will assure compliance with the requirements of this subpart;
(b) A schedule or schedules of compliance for:
(1) Pretreatment program development required by §125.66(c);
(2) Nonindustrial toxics control program required by §125.66(d); and
(3) Control of combined sewer overflows required by §125.67.
(c) Monitoring program requirements that include:
(1) Biomonitoring requirements of §125.63(b);
(2) Water quality requirements of §125.63(c);
(3) Effluent monitoring requirements of §125.60(b), 125.62(c) and (d), and 125.63(d).
(d) Reporting requirements that include the results of the monitoring programs required by paragraph (c) of this section at such frequency as prescribed in the approved monitoring program.
READ MORESHOW LESS
['Water Programs']
['Stormwater', 'Water Permitting', 'Point Sources', 'Water Quality', 'Municipal Wastewater', 'Industrial Wastewater']
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2024 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.