['Cranes, Lifts, and Scaffolding']
['Derricks', 'Mobile Cranes']
09/01/2023
...
(a) Plan development. Before beginning a crane/derrick operation in which more than one crane/derrick will be supporting the load, the operation must be planned. The planning must meet the following requirements:
(1) The plan must be developed by a qualified person.
(2) The plan must be designed to ensure that the requirements of this subpart are met.
(3) Where the qualified person determines that engineering expertise is needed for the planning, the employer must ensure that it is provided.
(b) Plan implementation. (1) The multiple-crane/derrick lift must be directed by a person who meets the criteria for both a competent person and a qualified person, or by a competent person who is assisted by one or more qualified persons (lift director).
(2) The lift director must review the plan in a meeting with all workers who will be involved with the operation.
[75 FR 48162, Aug. 9, 2010]
READ MORESHOW LESS
['Cranes, Lifts, and Scaffolding']
['Derricks', 'Mobile Cranes']
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2024 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.