Compliance Just Got Easier: Stay ahead of regulatory changes with instant notifications on updates that matter.
['Water Programs']
['Point Sources', 'Municipal Wastewater', 'Industrial Wastewater', 'Water Permitting', 'Stormwater', 'Water Quality']
04/02/2025
Applicable to State programs, see §123.25 (NPDES), 145.11 (UIC), 233.26 (404), and 271.14 (RCRA).)
(a) A fact sheet shall be prepared for every draft permit for a major HWM, UIC, 404, or NPDES facility or activity, for every Class I sludge management facility, for every 404 and NPDES general permit (§§237.37 and 122.28), for every NPDES draft permit that incorporates a variance or requires an explanation under §124.56(b), for every draft permit that includes a sewage sludge land application plan under 40 CFR 501.15(a)(2)(ix), and for every draft permit which the Director finds is the subject of wide-spread public interest or raises major issues. The fact sheet shall briefly set forth the principal facts and the significant factual, legal, methodological and policy questions considered in preparing the draft permit. The Director shall send this fact sheet to the applicant and, on request, to any other person.
(b) The fact sheet shall include, when applicable:
(1) A brief description of the type of facility or activity which is the subject of the draft permit;
(2) The type and quantity of wastes, fluids, or pollutants which are proposed to be or are being treated, stored, disposed of, injected, emitted, or discharged.
(3) For a PSD permit, the degree of increment consumption expected to result from operation of the facility or activity.
(4) A brief summary of the basis for the draft permit conditions including references to applicable statutory or regulatory provisions and appropriate supporting references to the administrative record required by §124.9 (fo (for EPA-issued permits);
(5) Reasons why any requested variances or alternatives to required standards do or do not appear justified;
(6) A description of the procedures for reaching a final decision on the draft permit including:
(i) The beginning and ending dates of the comment period under §124.10 and the address where comments will be received;
(ii) Procedures for requesting a hearing and the nature of that hearing; and
(iii) Any other procedures by which the public may participate in the final decision.
(7) Name and telephone number of a person to contact for additional information.
(8) For NPDES permits, provisions satisfying the requirements of §124.56.
(9) Justification for waiver of any application requirements under §122.21(j) or (q) of this chapter.
[64 FR 42470 Aug. 4, 1999; 65 FR 43661 July 13, 2000; 66 FR 53044 Oct. 18, 2001; 68 FR 13614 March 19, 2003]
['Water Programs']
['Point Sources', 'Municipal Wastewater', 'Industrial Wastewater', 'Water Permitting', 'Stormwater', 'Water Quality']
UPGRADE TO CONTINUE READING
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2026 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.
