Both the owner and the operator must sign the RAP application and any required reports according to §270.11(a) , (b) , and (c) . In the application, both the owner and the operator must also make the certification required under §270.11(d)(1) . However, the owner may choose the alternative certification under §270.11(d)(2) if the operator certifies under §270.11(d)(1) .
[63 FR 65873, Nov. 30, 1998]