['Air Programs']
['Hazardous Air Pollutants']
02/27/2022
...
Table 1 to Subpart LLL of Part 63 - Applicability of General Provisions
Citation | Requirement | Applies to subpart LLL | Explanation |
---|---|---|---|
63.1(a)(1)-(4) | Applicability | Yes | |
63.1(a)(5) | No | [Reserved]. | |
63.1(a)(6)-(8) | Applicability | Yes | |
63.1(a)(9) | No | [Reserved]. | |
63.1(a)(10)-(14) | Applicability | Yes | |
63.1(b)(1) | Initial Applicability Determination | No | §63.1340 specifies applicability. |
63.1(b)(2)-(3) | Initial Applicability Determination | Yes | |
63.1(c)(1) | Applicability After Standard Established | Yes | |
63.1(c)(2) | Permit Requirements | Yes | Area sources must obtain Title V permits. |
63.1(c)(3) | No | [Reserved]. | |
63.1(c)(4)-(5) | Extensions, Notifications | Yes | |
63.1(c)(6) | Reclassification | Yes | |
63.1(d) | No | [Reserved]. | |
63.1(e) | Applicability of Permit Program | Yes | |
63.2 | Definitions | Yes | Additional definitions in §63.1341. |
63.3(a)-(c) | Units and Abbreviations | Yes | |
63.4(a)(1)-(3) | Prohibited Activities | Yes | |
63.4(a)(4) | No | [Reserved]. | |
63.4(a)(5) | Compliance date | Yes | |
63.4(b)-(c) | Circumvention, Severability | Yes | |
63.5(a)(1)-(2) | Construction/Reconstruction | Yes | |
63.5(b)(1) | Compliance Dates | Yes | |
63.5(b)(2) | No | [Reserved]. | |
63.5(b)(3)-(6) | Construction Approval, Applicability | Yes | |
63.5(c) | No | [Reserved]. | |
63.5(d)(1)-(4) | Approval of Construction/Reconstruction | Yes | |
63.5(e) | Approval of Construction/Reconstruction | Yes | |
63.5(f)(1)-(2) | Approval of Construction/Reconstruction | Yes | |
63.6(a) | Compliance for Standards and Maintenance | Yes | |
63.6(b)(1)-(5) | Compliance Dates | Yes | |
63.6(b)(6) | No | [Reserved]. | |
63.6(b)(7) | Compliance Dates | Yes | |
63.6(c)(1)-(2) | Compliance Dates | Yes | |
63.6(c)(3)-(4) | No | [Reserved]. | |
63.6(c)(5) | Compliance Dates | Yes | |
63.6(d) | No | [Reserved]. | |
63.6(e)(1)-(2) | Operation & Maintenance | No | See §63.1348(d) for general duty requirement. Any reference to §63.6(e)(1)(i) in other General Provisions or in this subpart is to be treated as a cross-reference to §63.1348(d). |
63.6(e)(3) | Startup, Shutdown Malfunction Plan | No | Your operations and maintenance plan must address periods of startup and shutdown. See §63.1347(a)(1). |
63.6(f)(1) | Compliance with Emission Standards | No | Compliance obligations specified in subpart LLL. |
63.6(f)(2)-(3) | Compliance with Emission Standards | Yes | |
63.6(g)(1)-(3) | Alternative Standard | Yes | |
63.6(h)(1) | Opacity/VE Standards | No | Compliance obligations specified in subpart LLL. |
63.6(h)(2) | Opacity/VE Standards | Yes | |
63.6(h)(3) | No | [Reserved]. | |
63.6(h)(4)-(h)(5)(i) | Opacity/VE Standards | Yes | |
63.6(h)(5)(ii)-(iv) | Opacity/VE Standards | No | Test duration specified in subpart LLL. |
63.6(h)(6) | Opacity/VE Standards | Yes | |
63.6(h)(7) | Opacity/VE Standards | Yes | |
63.6(i)(1)-(14) | Extension of Compliance | Yes | |
63.6(i)(15) | No | [Reserved]. | |
63.6(i)(16) | Extension of Compliance | Yes | |
63.6(j) | Exemption from Compliance | Yes | |
63.7(a)(1)-(3) | Performance Testing Requirements | Yes | §63.1349 has specific requirements. |
63.7(b) | Notification period | Yes | Except for repeat performance test caused by an exceedance. See §63.1353(b)(6). |
63.7(c) | Quality Assurance/Test Plan | Yes | |
63.7(d) | Testing Facilities | Yes | |
63.7(e)(1) | Conduct of Tests | No | See §63.1349(e). Any reference to 63.7(e)(1) in other General Provisions or in this subpart is to be treated as a cross-reference to §63.1349(e). |
63.7(e)(2)-(4) | Conduct of tests | Yes | |
63.7(f) | Alternative Test Method | Yes | |
63.7(g) | Data Analysis | Yes | |
63.7(h) | Waiver of Tests | Yes | |
63.8(a)(1) | Monitoring Requirements | Yes | |
63.8(a)(2) | Monitoring | No | §63.1350 includes CEMS requirements. |
63.8(a)(3) | No | [Reserved]. | |
63.8(a)(4) | Monitoring | No | Flares not applicable. |
63.8(b)(1)-(3) | Conduct of Monitoring | Yes | |
63.8(c)(1)-(8) | CMS Operation/Maintenance | Yes | Temperature and activated carbon injection monitoring data reduction requirements given in subpart LLL. |
63.8(d) | Quality Control | Yes, except for the reference to the SSM Plan in the last sentence | |
63.8(e) | Performance Evaluation for CMS | Yes | |
63.8(f)(1)-(5) | Alternative Monitoring Method | Yes | Additional requirements in §63.1350(l). |
63.8(f)(6) | Alternative to RATA Test | Yes | |
63.8(g) | Data Reduction | Yes | |
63.9(a) | Notification Requirements | Yes | |
63.9(b)(1)-(5) | Initial Notifications | Yes | |
63.9(c) | Request for Compliance Extension | Yes | |
63.9(d) | New Source Notification for Special Compliance Requirements | Yes | |
63.9(e) | Notification of performance test | Yes | Except for repeat performance test caused by an exceedance. See §63.1353(b)(6). |
63.9(f) | Notification of VE/Opacity Test | Yes | Notification not required for VE/opacity test under §63.1350(e) and (j). |
63.9(g) | Additional CMS Notifications | Yes | |
63.9(h)(1)-(3) | Notification of Compliance Status | Yes | |
63.9(h)(4) | No | [Reserved]. | |
63.9(h)(5)-(6) | Notification of Compliance Status | Yes | |
63.9(i) | Adjustment of Deadlines | Yes | |
63.9(j) | Change in Previous Information | Yes | |
63.9(k) | Electronic reporting procedures | Yes | Only as specified in §63.9(j). |
63.10(a) | Recordkeeping/Reporting | Yes | |
63.10(b)(1) | General Recordkeeping Requirements | Yes | |
63.10(b)(2)(i)-(ii) | General Recordkeeping Requirements | No | See §63.1355(g) and (h). |
63.10(b)(2)(iii) | General Recordkeeping Requirements | Yes | |
63.10(b)(2)(iv)-(v) | General Recordkeeping Requirements | No | |
63.10(b)(2)(vi)-(ix) | General Recordkeeping Requirements | Yes | |
63.10(c)(1) | Additional CMS Recordkeeping | Yes | PS-8A supersedes requirements for THC CEMS. |
63.10(c)(1) | Additional CMS Recordkeeping | Yes | PS-8A supersedes requirements for THC CEMS. |
63.10(c)(2)-(4) | No | [Reserved]. | |
63.10(c)(5)-(8) | Additional CMS Recordkeeping | Yes | PS-8A supersedes requirements for THC CEMS. |
63.10(c)(9) | No | [Reserved]. | |
63.10(c)(10)-(15) | Additional CMS Recordkeeping | Yes | PS-8A supersedes requirements for THC CEMS. |
63.10(d)(1) | General Reporting Requirements | Yes | |
63.10(d)(2) | Performance Test Results | Yes | |
63.10(d)(3) | Opacity or VE Observations | Yes | |
63.10(d)(4) | Progress Reports | Yes | |
63.10(d)(5) | Startup, Shutdown, Malfunction Reports | No | See §63.1354(c) for reporting requirements. Any reference to §63.10(d)(5) in other General Provisions or in this subpart is to be treated as a cross-reference to §63.1354(c). |
63.10(e)(1)-(2) | Additional CMS Reports | Yes | |
63.10(e)(3) | Excess Emissions and CMS Performance Reports | Yes | Exceedances are defined in subpart LLL. |
63.10(e)(3)(v) | Due Dates for Excess Emissions and CMS Performance Reports | No | §63.1354(b)(9) specifies due date. |
63.10(e)(3)(vii) and (viii) | Excess Emissions and CMS Performance Reports | No | Superseded by 63.1354(b)(10). |
63.10(f) | Waiver for Recordkeeping/Reporting | Yes | |
63.11(a)-(b) | Control Device Requirements | No | Flares not applicable. |
63.12(a)-(c) | State Authority and Delegations | Yes | |
63.13(a)-(c) | State/Regional Addresses | Yes | |
63.14(a)-(b) | Incorporation by Reference | Yes | |
63.15(a)-(b) | Availability of Information | Yes |
[80 FR 44791, July 27, 2015, as amended at 83 FR 35135, July 25, 2018; 83 FR 38036, Aug. 3, 2018; 85 FR 73898, Nov. 19, 2020]
Table 2 to Subpart LLL of Part 63 - 1989 Toxic Equivalency Factors (TEFs)
Dioxins/Furans | TEFs 1989 |
---|---|
2,3,7,8-TCDD | 1 |
1,2,3,7,8-PeCDD | 0.5 |
1,2,3,4,7,8-HxCDD | 0.1 |
1,2,3,6,7,8-HxCDD | 0.1 |
1,2,3,7,8,9-HxCDD | 0.1 |
1,2,3,4,6,7,8-HpCDD | 0.01 |
OCDD | 0.001 |
2,3,7,8-TCDF | 0.1 |
1,2,3,7,8-PeCDF | 0.05 |
2,3,4,7,8-PeCDF | 0.5 |
1,2,3,4,7,8-HxCDF | 0.1 |
1,2,3,6,7,8-HxCDF | 0.1 |
1,2,3,7,8,9-HxCDF | 0.1 |
2,3,4,6,7,8-HxCDF | 0.1 |
1,2,3,4,6,7,8-HpCDF | 0.01 |
1,2,3,4,7,8,9-HpCDF | 0.01 |
OCDF | 0.001 |
[83 FR 35135, July 25, 2018]
Source: 64 FR 31925, June 14, 1999, unless otherwise noted.
READ MORESHOW LESS
['Air Programs']
['Hazardous Air Pollutants']
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2024 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.