['Air Programs']
['Hazardous Air Pollutants']
08/19/2024
...
Citation | Subject | Applies to this subpart? | Explanation |
---|---|---|---|
§63.1(a)(1) through (4), (6), and (10) through (12), (b)(1) and (3), (c)(1), (2), and (5), (e) | Applicability | Yes. | |
§63.1(a)(5) and (7) through (9), (b)(2), (c)(3) and (4), (d) | Reserved | No. | |
§63.2 | Definitions | Yes. | |
§63.3 | Units and Abbreviations | Yes. | |
§63.4 | Prohibited Activities and Circumvention | Yes. | |
§63.5 | Preconstruction Review and Notification Requirements | No. | |
§63.6(a), (b)(1) through (5) and (7), (c)(1), (2), and (5) | Compliance with Standards and Maintenance Requirements—Applicability and Compliance Dates | Yes. | |
§63.6(e)(1)(i) | Operation and Maintenance Requirements—general duty to minimize emissions | Yes before November 12, 2024 No on or after November 12, 2024 | See §§63.11147(c) and 63.11148(f) for the general duty to minimize emissions at all times at existing sources. See §63.11149(c)(3) for the general duty to minimize emissions at all times at new sources. |
§63.6(e)(1)(ii) | Requirement to correct malfunctions as soon as practicable. | Yes before November 12, 2024 No on or after November 12, 2024 | Malfunctions are no longer exempt. |
§63.6(e)(1)(iii) | Yes. | ||
§63.6(e)(3) | Startup, Shutdown, and Manufacturing Plan | Yes before November 12, 2024 No on or after November 12, 2024 | The requirements for emergency situations for existing sources are contained in §§63.11147(c)(5) and 63.11148(f)(5). See §63.11149(d) for the emergency requirements for new sources. |
§63.6(f)(1) | Compliance with Nonopacity Emission Standards | Yes before November 12, 2024 No on or after November 12, 2024 | Emission standards apply at all times. Some requirements of §63.6(f)(1) are no longer applicable. |
§63.6(f)(2) through (3) | Yes. | ||
§63.6(g), (i), (j) | Compliance with Nonopacity Emission Standards | Yes. | |
§63.6(h)(1) | Compliance with Opacity and Visible Emission Standards | Yes before November 12, 2024 No on or after November 12, 2024 | Requirements apply to new sources but not existing sources. Emission standards apply at all times. Some requirements of §63.6(h)(1) are no longer applicable. |
§63.6(b)(6), (c)(3) and (4), (d), (e)(2), (e)(3)(ii), (h)(2)(ii), (h)(3), (h)(5)(iv), (i)(15) | Reserved | No. | |
§63.6(h)(2) through (4), (h)(5)(i) through (iii), (h)(6) through (9) | Yes/No. | Requirements apply to new sources but not existing sources. | |
§63.7(a), (e)(2) through (4), (f), (g), (h) | Performance Testing Requirements | Yes. | |
§63.7(e)(1) | Performance Testing Requirements | No | See §63.11148(e) for performance testing requirements. |
§63.7(b), (c) | Yes/No | Notification of performance tests and quality assurance program apply to new sources but not existing sources. | |
§63.8(a)(1) and (2), (b), (c)(1)(ii), (c)(2) through (8), (f), (g) | Monitoring Requirements | Yes. | |
§63.8(c)(1)(i) and (iii) | General Duty and SSM Plan Requirements for Continuous Monitoring Systems | Yes before November 12, 2024. No on or after November 12, 2024. | |
§63.8(a)(3) | Reserved | No. | |
§63.8(a)(4) | No | This subpart does not require flares. | |
§63.8(d)(1) and (2), (e) | Quality Control | Yes/No | Requirements for quality control program and performance evaluations apply to new sources but not existing sources. |
§63.8(d)(3) | Written Procedures for Continuous Monitoring Systems | Yes before November 12, 2024 No on or after November 12, 2024 | Requirements for quality control program and performance evaluations apply to new sources but not existing sources. See §63.11149(b)(3). |
§63.9(a), (b)(1), (2), and (5), (c), (d), (h)(1) through (3), (5), and (6), (i), (j) | Notification Requirements | Yes. | |
§63.9(b)(3), (h)(4) | Reserved | No. | |
§63.9(b)(4), (f) | No. | ||
§63.9(e), (g) | Yes/No | Notification requirements for performance test and use of continuous monitoring systems apply to new sources but not existing sources. | |
§63.9(k) | Electronic submission of notifications or reports | Yes. | |
§63.10(a), (b)(1), (d)(1), (2), and (4), (f) | Recordkeeping and Reporting Requirements | Yes/No | Recordkeeping requirements apply to new sources but not existing sources. |
§63.10(b)(2)(iii) and (vi) through (xiv), (b)(3), (c)(1), (5) through (8), and (10) through (14), (e)(1) and (2) | Yes/No | Recordkeeping requirements apply to new sources but not existing sources. | |
§63.10(b)(2)(i) through (ii) and (iv) through (v) | General Recordkeeping Requirements and Actions to Minimize Emissions During Startup, Shutdown, and Malfunction | Yes before November 12, 2024 No on or after November 12, 2024 | Recordkeeping requirements apply to new sources but not existing sources. See §63.11149(c)(4). Startup, Shutdown, and Malfunction are no longer exempt from emission standards. See §63.11148(g). |
§63.10(c)(2) and (4) and (9) | Reserved | No. | |
§63.10(c)(15) | Use of Startup, Shutdown, and Malfunction Plan | For new sources, Yes before November 12, 2024 No on or after November 12, 2024 | Recordkeeping requirements apply to new sources but not existing sources. Startup, Shutdown, and Malfunction Plans are no longer required. |
§63.10(d)(3), (e)(4) | No | Reporting requirements apply to new sources but not existing sources. | |
§63.10(d)(5) | Startup, Shutdown, and Malfunction Reporting | For new sources, Yes before November 12, 2024 No on or after November 12, 2024 | Reporting requirements apply to new sources but not existing sources. See §§63.11147(e), 63.11148(h), 63.11149(e)(2). |
§63.10(e)(3) | Yes/No | Reporting requirements apply to new sources but not existing sources. | |
§63.11 | Control Device Requirements | No | This subpart does not require flares. |
§63.12 | State Authorities and Delegations | Yes. | |
§63.13 | Addresses | Yes. | |
§63.14 | Incorporations by Reference | Yes. | |
§63.15 | Availability of Information and Confidentiality | Yes. | |
§63.16 | Performance Track Provisions | Yes. |
[89 FR 41722, May 13, 2024]
READ MORESHOW LESS
['Air Programs']
['Hazardous Air Pollutants']
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2024 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.