['Waste']
['Solid Waste']
05/04/2022
...
(a) Owners or operators of all MSWLF units must design, construct, and maintain:
(1) A run-on control system to prevent flow onto the active portion of the landfill during the peak discharge from a 25-year storm;
(2) A run-off control system from the active portion of the landfill to collect and control at least the water volume resulting from a 24-hour, 25- year storm.
(b) Run-off from the active portion of the landfill unit must be handled in accordance with §258.27(a) of this part.
READ MORESHOW LESS
['Waste']
['Solid Waste']
Load More
J. J. Keller is the trusted source for DOT / Transportation, OSHA / Workplace Safety, Human Resources, Construction Safety and Hazmat / Hazardous Materials regulation compliance products and services. J. J. Keller helps you increase safety awareness, reduce risk, follow best practices, improve safety training, and stay current with changing regulations.
Copyright 2024 J. J. Keller & Associate, Inc. For re-use options please contact copyright@jjkeller.com or call 800-558-5011.